Top Must-Haves:
MES Client-X, SAP EWM, Data and integration architecture, Process design in GMP manufacturing, Fit-gap analysis, and requirements engineering
" Translate NCF business needs into process designs, functional requirements, data requirements, and integration touchpoints to enable MES (Client X) and SAP (incl. EWM) design and sourcing readiness.
" Ensure the program produces the pre-implementation outputs explicitly called out: design confirmation, data & integration requirements, fit-gap analysis, and timelines.
" Support cross-functional alignment across the identified application ecosystem (MES, SAP/ERP, RTS, IT/OT pipeline, LIMS, QMS/QDMS, Historian, Asset Mgmt, etc.) where interfaces impact MES/SAP outcomes.