Break Down Posted On: April 3, 2026 Closing On: April 9, 2026
JB
At Atlantic Building Tower 2, a suspected refrigerant gas leakage was identified in the Fresh Air Handling Unit (FAHU) cooling coil section. Oil stains near the coil surface and brazed joints indicates possible leakage points. The issue is likely caused by corrosion, joint failure, or mechanical vibration. Immediate inspection, leak detection, and repair or replacement of the cooling coil are recommended, followed by system testing and commissioning.
Take the next step and apply for this exciting opportunity
Apply Now