Position: Development Miner
Project: Galleon Gold – West Cache Gold Project
Rotation: 14/14
Shift: 12 Hour shifts
Wage: $67.00 – $81.50/HR
Potential Compensation: KPI / Retention Bonus – Referral Bonus
Travel/Accommodations/Meals: Per Site Specific Allowance
As a Development Miner with Dumas, you will perform underground development activities such as drilling, blasting, scaling, and installing ground support. You’ll operate and maintain equipment like jumbos, bolters, and scoops, ensuring compliance with safety protocols, and conduct routine checks and maintenance.
Take the next step and apply for this exciting opportunity
Apply Now